20-1000 Gallon | Heavy Duty & Portable

Electric Direct Drive Heavy Duty Clamp Mount Mixer

Electric Direct Drive Heavy Duty Clamp Mount Mixer
Electric Direct Drive Heavy Duty Clamp Mount Mixer
Electric Direct Drive Heavy Duty Clamp Mount Mixer
Electric Direct Drive Heavy Duty Clamp Mount Mixer
Electric Direct Drive Heavy Duty Clamp Mount Mixer
20-1000 Gallon | Heavy Duty & Portable

Electric Direct Drive Heavy Duty Clamp Mount Mixer

Regular price $2,461.00
/
Lead Time: 3 Business Days
The workhorse of our portable mixer line, the heavy duty clamp mount mixer offers increased shaft stability and horizontal adjustment at the clamp for optimal placement of the impeller in your mixing vessel. Highly portable and durable.
Part Number: HDC033VDD-32

The heavy duty clamp mount mixer is the workhorse of our portable mixer line. A heat treated aluminum housing provide both outstanding durability and lightweight portability.

Our heavy duty clamp mount mixer includes:

  • Lower support bearing included to reduce radial shaft load on the motor, extending longevity
  • Adjustability for shaft positioning on two axes of rotation
  • Heavy-duty electric motor with optional VFD
  • Wetted materials made of 316 or 304 grade stainless steel for corrosion and abrasion resistance
  • Option to select desired horsepower and shaft length
  • Appropriate propeller or hydrofoil impeller matched to the selected horsepower and shaft length

  • Item Number HDC033VDD-32
  • Enclosure type IP55
  • Horsepower 1/3 HP
  • Impeller attachment Set screw
  • Impeller diameter 4 in.
  • Impeller material 316SS
  • Impeller type Propeller
  • Lead time 3 Business Days
  • Motor type TEFC Electric
  • Mount Heavy Duty Clamp
  • Mount dimension 3.5 in.Max Opening
  • Number of impellers 1
  • Phase 1 Ph.
  • Rpm 350-1750
  • Shaft diameter 1 in.
  • Shaft length 32 in.
  • Shaft material 316SS
  • Speed controller Variable Frequency Drive (VFD)
  • Voltage 115V
What shipping methods do you offer?

UPS Package, FedEx Package, FedEx Freight

What are your payment options?

Credit Card and Pay Pal

Where are you shipping from?

All products are shipped from our plant in Jeffersonville, Indiana.

What time zone are you in?

Eastern Standard Time (NY)

How do I purchase with a PO?

Contact our sales team at sales@mxdprocess.com

What does lead time mean?

Lead time is the average number of business days until the product ships, it does not include shipping days.

Recently viewed